top of page
Screenshot 2023-07-26 at 11.42.48.png

Full Kitchen Renovation and Electrical Installations

  • Writer: Coe Media
    Coe Media
  • Jul 26, 2023
  • 1 min read

First fixed this kitchen and upon our return we have completed the second fix which included:

- New socket circuit - Upgrading the cooker/combi micro supply - Installation of brushed steel sockets - Integrated charging station built into the kitchen draws

All the lighting replaced with LED, including in cupboard lighting controlled by door sensor.




Komentáře


bottom of page